DPW Forms

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Permits & Projects (click to view available forms)14 documents

  • Irrigation / 2nd meter packet rev2023March (Fillable PDF)
    document seq 1.00
    Irrigation / 2nd meter permits are issued at the Department of Public Works to the homeowner or their contractor. A Plumbing permit, also required, is issued by the Building Department at the counter to the homeowner or a licensed plumber. A Backflow Certified plumber or irrigation specialist must test the backflow device on your irrigation system. Submit Backlfow Test results to the Department of Public Works prior to scheduling the installation of the irrigation / 2nd meter. (rev. 01/2021)
  • Contractor Registration 2024-2025 (Fillable PDF)
    document seq 2.00
    Contractor registration for Sewer and/or Water installation in Washington Township expire on March 31 every year. Details required for insurance and bond as well as the Registration form, are included in this packet.
  • Application for DEVELOPMENT and Construction Permit rev2019 (Fillable PDF)
    document seq 3.00
    The Department of Public Works requires this form to be submitted at the time development plans are submitted for engineering review.
  • Application for MULTI FAMILY or COMMERCIAL revJan2023 (Fillable PDF)
    document seq 4.00
    Submit completed form to the Building Department when applying for ANY DPW permits on Multi Family or Commercial properties which includes New Construction, Interior Finish, Grade Changes, etc.
  • Application for SINGLE FAMILY HOME revJan2023 (Fillable PDF)
    document seq 5.00
    Submit completed form to the Building Department when applying for ANY DPW permits on Residential properties, which includes New Construction, Grade Changes, in-ground pools, etc.
  • Plot Plan Requirements revJune2020
    document seq 6.00
    The Plot Plan Requirements are intended as a general guide for information to be provided on plot plans.  This list is not all-inclusive as additional information may be required for special circumstances based on individual reviews.
  • POOL Plot Plan Requirements revFeb2018
    document seq 6.50
    The Plot Plan Requirements are intended as a general guide for information to be provided on plot plans.  This list is not all-inclusive as additional information may be required for special circumstances based on individual reviews.
  • As Built Review Checklist revJan2023
    document seq 7.00
    The Department of Public works requires this completed form to be submitted with As Built Plans for review. The As Built Plans must be submitted and approved within 6 months of underground construction being completed or building permits may not be issued.
  • As Built Plot Plan  SAMPLE
    document seq 8.00
    This is an As Built Plot Plan sample. as Built Plot Plans are required by the Department of Public Works, along with a Final Grade Certification for Final Grade inspections.
  • Certification of Final Grade- Cover letter & Sample revJan2023 (Fillable PDF)
    document seq 9.00
    For Final Grade: Email to the DPW one (1) as-built plot plan and a signed and sealed Certificate of Final Grade from a registered civil engineer or surveyor.
  • Soil Removal License application (Fillable PDF)
    document seq 11.00
    The Superintendent of Public Works oversees mining and soil removal operations in the Township. The Planning Commission approval and Township Board approval may be required for new sites.
  • Soil Removal License Renewal application (Fillable PDF)
    document seq 12.00
  • Application to DISCONNECT from public Water and/or Sewer revJan2023 (Fillable PDF)
    document seq 13.00
    Use this application to request a disconnect from public water and/or public sewer services. The completed application and deposit are to be submitted to the Department of Public Works (DPW).
  • Paving Rehabilitation Application (Fillable PDF)
    document seq 14.00
    Required PRIOR to making any removal, repair or replacement of PRIVATE roads OR multi-family, commercial properties.

Water & Sewer Billing (click to view available forms)3 documents

  • Customer Penalty/ Adjustment Request (Fillable PDF)
    document seq 1.00
    To request a Penalty Reversal on your water/sewer bill, complete the Customer Penalty/ Adjustment Request form. The Finance Committee reviews the completed form as well as your account payment history for the past three (3) years. In general, a penalty removal request will be granted not more than once (1) per three (3) year period for customers with no history of late payments. You will be contacted by email with the Finance Committee's decision. (Rev6 Nov2021)
  • Seasonal Sprinklers 2023
    document seq 2.00
    This packet contains the required forms for seasonal meter installation in Washington Township. The completed Memorandum of Understanding can be submitted: in person, dropbox at Township Hall, by mail, or by email. NOTE: Backflow assemblies must be tested every year by an ASSE certified tester.
  • Storm or Sanitary Sewer Back-up Claim Form revJan2023 (Fillable PDF)
    document seq 3.00
    You must file a written claim with the Department of Public Works within 45 days of a storm or sanitary sewer overflow or back-up. Failure to provide the completed form within the specified timeframe will prevent recovery of damages.